All articles
GuideShipInspect Pro

NCR Tracking at the Shipyard — Best Practices for Non-Conformity Management in Newbuilding

6 min read·

Non-Conformity Reports are the backbone of quality control at the shipyard. Here is how to track them properly — from identification through corrective action to close-out — without losing anything in the process.

Every newbuilding project generates Non-Conformity Reports (NCRs). A welding defect, a pipe misalignment, a coating failure, an incorrect material grade — these are the daily realities of shipyard construction. The question is not whether NCRs will arise, but whether your team can track them reliably from identification through corrective action to verified close-out.

Poor NCR management is one of the most common causes of delivery delays and post-delivery warranty claims. If an NCR falls through the cracks — which happens easily when tracking is spread across emails, spreadsheets, and paper forms — the defect resurfaces later at much higher cost.

The NCR lifecycle

  • Identification — the defect or non-conformity is discovered during inspection and formally documented with photos, location, and reference to the applicable specification.
  • Root cause analysis — the team determines why the non-conformity occurred (workmanship, material, design, process).
  • Corrective action plan — the shipyard proposes a remediation plan, reviewed and accepted by the supervision team.
  • Execution — the corrective work is carried out.
  • Verification — the supervision team re-inspects to confirm the corrective action is complete and satisfactory.
  • Close-out — the NCR is formally closed with documented evidence.

Common mistakes in NCR tracking

  • No unique numbering system — makes it impossible to reference NCRs consistently across departments.
  • Photos not linked to the NCR record — evidence gets separated from the report.
  • No deadline tracking — corrective actions drag on indefinitely.
  • Spreadsheet-based tracking — multiple versions, no audit trail, no automated reminders.
  • NCRs closed without verification photos — creates disputes at delivery.

How software changes NCR management

ShipInspect Pro tracks the full NCR lifecycle digitally. Every NCR gets a unique number, linked photos, a status trail (Open → Corrective Action → Verification → Closed), deadline tracking with alerts, and a complete audit log. NCR statistics feed into the project risk dashboard and monthly reports automatically. At delivery, you have a clean, auditable record of every non-conformity and how it was resolved.

Start tracking NCRs properly

If your team is still managing NCRs in spreadsheets, request a free trial of ShipInspect Pro to see how a purpose-built system handles the full lifecycle — with sample data so you can evaluate before committing.

See ShipInspect Pro in action

Request a free 7-day trial with sample data and see how it fits your newbuilding project.